Language

Train Air Conditioner Unit, Vortex Compressor/R22 Refrigerant/Adjustable According to Train Loading

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-22 07:36

  • Browse the number:

    173

Send an inquiries
Company Profile
Guangzhou Kingbo Refrigeration Equipment Co. Ltd
By certification [File Integrity]
Contact:

kingbocn(Mr.)  

Telephone:

Area:

Beijing

Address:

No. 5 Pingshan Industrial Park, Huashan Town, Huadu District, Guangzhou, Guangdong, China (510880)

Website:

http://kingbocn.nikeshoeszjh.com/

Product Details
Model Number: KLD29, KLD35, KLD40 series Brand Name: Kingbo Key Specifications/Special Features: Specifically designed for the railway vehicles, users can adjust the air parameters according to need for the hygienic and comfortable in-train environmentRoof-mount type, discharge the air from the side of the flat bottom and being installed-on the top roof of the train, the controller cabinet with the air conditioner units is installed into the electrical distribution facilities room of the train, the units are connected with cabinet by the electronic connectorAir inlet of the units is connected with the trains by sealed rubber tubeAir outlet of the unit is connected with the trains by soft tubeThe units can fill up the fresh air to the carriage via the fresh air window
  • Adopts completely sealed vortex compressor, R22 refrigerant &capillary for throttling parts
  • There are two independent cooling recycle systems in each unit
  • It is adjustable according to the train loading
  • The control system methods are manual controls, automatic controls, and centralized controls
  • Main parts: vortex compressor, evaporator, condenser, capillary, liquid-vapor separator, dry filter, axial type condenser fan, centrifugal blower, electronic heater and more
  • All parts are assembled in the stainless steel cabinet to form the air conditioner unit
  • Refrigeration components and tubes adopts silver brazing
  • The air discharge window is installed in the front of the system, the fresh air window is installed in the back end of the system and the return air window is installed in the bottom of system
  • The condensed water can be designed to be discharged by scattered mode and centralized mode
  • The power lines of units are lead-in from the return air window
  • Shipping Information:
    • FOB Port: Guangzhou
    • Lead Time: 7 - 15 days
    Main Export Markets:
    • Eastern Europe
    • North America
    • Mid East/Africa
    • Central/South America
    • Asia
    • Western Europe
    • Australasia

    Download more information about this product